We find solutions for optimum operating efficiency towards a better
future ahead. Renewable energy option for energy sustainability and
cost cutting benefits.

La Corona RMC-City of San Fernando

The scope of work completed are:

Installation of Two Lightning Arresters
Installation of Two 50hp Inverters/VFDs

ManMan Vibro Plant-Porac, Pampanga

The scope of work completed are:

Installation of 60 KVAR Capacitor Bank with Automatic Switching

268 Mall, Angeles City

The scope of work completed are:

Installation of 100 KVAR Capacitor
Installation of two 50hp Inverters/VFDs

United Pentagon Steel Forming Corporation

The scope of work completed are:

Design and Impact Study of expansion Plant
Industrial Automation Preventive Maintenance

Betis’ Best Meat Product

The scope of work completed are:

Design and Impact Study of expansion Plant
Industrial Automation Preventive Maintenance
On going 10kWp Solar Installation

Midori Dormitory and Admin Building

The scope of work completed are:

Impact Study for 519.5kWp Solar Installation
Proposal of 519.5kWp grid-tie Solar

MEW Hog Farm

The scope of work completed are:

Installation of 150kWp Grid-Tie Solar
Installation of 500kVA biogas
Generator with synchronizing Panel

BIG-C Flour Mill

The scope of work completed are:

Installation of 150kWp Grid-Tie Solar
Installation Inverters/VFDs
Industrial Automation

Chicken Farm – Florida

The scope of work completed are:

Impact Study for 200kWp Solar Installation
Proposal of 200kWp grid-tie Solar

RED DRAGON FARM Feed Mill Plant

The scope of work completed are:

Impact Study for 200kWp Solar Installation
Proposal of 200kWp grid-tie Solar
Proposal of 200kWp grid-tie Solar